Menu

+91 9620050727
+91 8620888111
info@royalindraprastha.com
Ongoingmodern-apartment-building-with-brick-facade-and-green-balconiesBoutique Apartments

Song of Wind

RERA : PRM/KA/RERA/1251/310/PR/040924/006990

Designed for those who appreciate the charm of niche, tight-knit neighbourhoods

Awarded for Best Creative Design for Ongoing Architecture @ FOAID, New Delhi 2024

₹ 1.35 Crore* onwards

Expected Handover : January 2026

Designed for those who appreciate the charm of niche, tight-knit neighbourhoods

Address:

Banashankari 6th stage, Nagegowdanapalya, Uttarahalli -Manavarthekaval, Bengaluru, 560109

Open in Google Map
Features

  • No Common Walls
  • 100% Vaastu
  • Exclusive 16 units of 3 BHK homes
Property Details

  • Total 3 BHK Units : 16
  • Size : 1691 – 1860 Sq. Ft
  • Total Usable Carpet Area : 77%
  • Floors No : G + 3
  • Bedrooms : 3
  • UDS ≈ 36%
  • Facing : East or North
  • Bathrooms : 3
  • Balconies : 3
Amenities
  • Multipurpose Hall
  • Fully Equipped Gym
  • Spacious Sky Lounge
  • Children’s Play Area
  • Library
  • Yoga area
  • Senior Citizen Park
  • 100% Power Backup
Fixtures

Fixtures

  • Main door : Burma / Ghana Teak wood
  • Bathroom Fixtures : Kohler or Equivalent
  • Tiles : Kajeria or Equivalent
  • Switches : Schneider Unica or Equivalent
  • Master Bedroom : Wooden Flooring
  • Lifts : Johnson or Equivalent
Location Advantage
  • Silk Institute Metro Station : 5 mins
  • Nice Road : 6 mins
  • Electronic City : 30 mins
  • Forum Mall : 15 Mins
  • ISCKON Temple : 17 Mins
  • Art of Living International Centre : 10 Mins
  • Metro Cash and Carry : 20 Mins
  • Manipal Hospital : 20 Mins
  • Holiday Village Resort : 15 mins
  • Sri Kumaran School : 16 mins
  • Delhi Public School : 22 mins
  • Valiants Academy Campus : 11 mins
Project Status
Mar
2024
Sep
2024
Mar
2025
Sep
2025
Feb
2026

Current Completion : 93%
Status as of 10th Feb 2026 : Internal plastering and External plastering completed (100%)
Vitrified flooring and Toilets Tiling Completed (100%)
Putty work completed (100%)
Elevation cladding completed (100%)
Basement plastering abs painting completed (100%)
Windows fixing completed (100%)
Grills fixing completed (100%)
Door fixing completed (100%)
Staircase railings fabrication completed (100%)
Granite work completed (100%)
External texture and Dampproof completed (100%)
Basement flooring concrete and Ramp completed (100%)
Compound wall blockwork and plastering completed (Left side)(35%)
Terrace waterproofing and concrete completed (100%)
Lift installation completed(95%)
Elevation Jalli work InProgress (70%)
Internal Final painting work InProgress(20%)
Project Status : Right On Schedule
Next Update on 10th Mar 2026

Current Status

Banking Partners :
Image 1
Image 2
Affordability Calculator :
Download
Details
Schedule Site Visit
Back to Home